IBIM CDE

One common data environment from design review to facility operations.

Documents, models, site issues and assets in one place, organised the ISO 19650 way: work in progress stays with its team, and shared or published information goes through checks you can trace.

Available running in the live iBIM CDE todayPreview built and tested, not yet released to the live CDEPlanned not built yet
HOW IT WORKS

Three workflows, start to finish

Sample data. "Riverside Clinic" is a fictional project. Every name, file, number and date in these three examples is invented to show the workflow.

Sample drawing RC-ARC-DR-0101 moving from work in progress (P01.01) to shared for review (S1) to published (A3, C01) after consultant and owner approval 01 WIP02 SHARED03 PUBLISHED RC-ARC-DR-0101P01.01RC-ARC-DR-0101S1 · P01RC-ARC-DR-0101A3 · C01 naming ✓to: StructureConsultant ✓Owner ✓ SAMPLE

Document approval

  1. The architect adds drawing RC-ARC-DR-0101 to work in progress; its name is checked against the project's ISO 19650 rule.Available
  2. It is shared for coordination (S1) with a transmittal to the structural engineer.Available
  3. The consultant reviews and the owner approves; each decision is recorded against that exact file.Available
  4. It is published (A3, revision C01) with its full history kept.Available
Sample clash: duct DU-12 runs through beam B-204 on level 3; issue 14 is assigned to the MEP lead with a due date ! Issue #14Duct DU-12 × beam B-204Level 3 · clash, hardAssigned: MEP lead Due in 5 days SAMPLE

Coordination issue resolution

  1. Architecture, structure and MEP models are published from Revit as versions anyone on the project can open in a browser.Available
  2. A clash check across the three models finds duct DU-12 running through beam B-204 on level 3.Available
  3. Issue #14 is raised with the 3D viewpoint and assigned to the MEP lead with a due date.Available
  4. The MEP lead publishes a revised model; the check is run again and the issue is closed with its history.Available
Sample supply-air temperature of AHU-02 rising above its 18 degree limit, followed by work order WO-0031, closed AHU-02 supply air, °C limit 18 °C Work order WO-0031AHU-02 · Level 5Inspect supply-airtemperature sensor Status: closed SAMPLE

Asset maintenance

  1. The asset register is built from the COBie data in the published as-built model: AHU-02 on level 5.Available
  2. Sensor readings are shown on the model. (Readings in the live CDE today come from demonstration data.)Available
  3. A rule notices the supply-air temperature above its limit for five minutes and suggests an inspection.Preview
  4. Work order WO-0031 is created for AHU-02 in the published model and closed with the technician's notes.Available
CAPABILITIES

What the iBIM CDE does today, and what is coming

Document control

ISO 19650 information containers with checks you can trace, from work in progress to published and archived information.

  • Information containers through WIP, Shared, Published and Archived, with naming checks, status codes and revision historyAvailable
  • Transmittals issued as one recorded action, with an evidence record and PDFAvailable
  • Submittal reviews: consultant review then owner approval, with an issued package recordAvailable
  • Revision comparison with an impact reviewPreview
  • Attention list and snapshot reportsPreview

Model coordination

Revit models published as versioned web models, federated and checked for clashes in the browser.

  • Publish from Revit to versioned web models and view them in the browserAvailable
  • Federated clash check in the browser and BCF 2.1 issuesAvailable
  • BCF 3.0 import and exportPreview

Field workflows

Questions and site observations captured where the work happens, on a phone or tablet.

  • RFIs, site and safety reports, 4D / 5D planAvailable
  • Phone and tablet layout, site photos, offline review copyAvailable
  • Conflict-safe sync of field issues between devicesPreview
  • App Store and Play Store appsPlanned

Facility operations

An asset register and maintenance work orders tied to the published as-built model.

  • Asset register built from COBie; maintenance work orders tied to the published modelAvailable
  • Live sensor view (currently fed with demonstration data)Available
  • Rule-based condition monitoring with work-order suggestionsPreview
  • Predictive maintenancePlanned
Release evidence: how each label was checked

Labels were checked on 3 Oct 2026 against the live iBIM CDE build d96c53c, read from the CDE's public version address. Available: the change that delivers it is part of that live build. Preview: built and tested in the iBIM CDE code, not yet part of the live build, so not available to customers yet. Planned: not built yet. Labels are checked again before each release of this page.

Release evidence for each capability
CapabilityLabelEvidenceIn live buildLast checked
Information containers through WIP, Shared, Published and Archived, with naming checks, status codes and revision historyAvailablecommit 51ac35bYes3 Oct 2026
Transmittals issued as one recorded action, with an evidence record and PDFAvailablecommit d96c53c, release backport of 698cc7cYes3 Oct 2026
Submittal reviews: consultant review then owner approval, with an issued package recordAvailablecommit 24080ceYes3 Oct 2026
Revision comparison with an impact reviewPreviewcommit cc9ad51No3 Oct 2026
Attention list and snapshot reportsPreviewcommit ffa3e50, 578fd7fNo3 Oct 2026
Publish from Revit to versioned web models and view them in the browserAvailablecommit 63c5bb2Yes3 Oct 2026
Federated clash check in the browser and BCF 2.1 issuesAvailablecommit 517520cYes3 Oct 2026
BCF 3.0 import and exportPreviewcommit 8d9a587No3 Oct 2026
RFIs, site and safety reports, 4D / 5D planAvailablecommit 0eeea12, 8bf3794Yes3 Oct 2026
Phone and tablet layout, site photos, offline review copyAvailablecommit 1ab8514Yes3 Oct 2026
Conflict-safe sync of field issues between devicesPreviewcommit ba2750eNo3 Oct 2026
App Store and Play Store appsPlannedapp project prepared in mobile/, not published-3 Oct 2026
Asset register built from COBie; maintenance work orders tied to the published modelAvailablecommit f2d2fab, 1490f72Yes3 Oct 2026
Live sensor view (currently fed with demonstration data)Availablecommit 1ab8514, the telemetry view is live; the readings shown today come from a demo simulatorYes3 Oct 2026
Rule-based condition monitoring with work-order suggestionsPreviewcommit 34669cfNo3 Oct 2026
Predictive maintenancePlannedrule-based monitoring comes first-3 Oct 2026